Supplementary risk assessment for the construction/assembly site, film set, trade fair construction, pruning work, assembly of photovoltaic/solar systems, maintenance; Checklists for action control
Work on construction and assembly sites, on film sets, in trade fair construction, pruning work, the assembly of photovoltaic/solar systems and maintenance often pose particular risks that are not taken into account in the general operational risk assessment. In order to support those responsible for work, the BG ETEM has developed the "Supplementary Risk Assessment" for them.
The application also captures important aspects of organizing and safely performing electrical engineering work. After processing, the log file can be saved as a PDF and sent (by email, Bluetooth, WiFi Direct...).
Please note: A PDF reader (e.g. Acrobat Reader) that can display forms is required to edit the log file.